The Atalanti is a DP-2 Cable Laying Vessel that has been specially designed and engineered for cable laying and protection works in shallow waters, which are not normally accessible by large cable laying vessels. She can handle at least 4,500 tons of cable in one or two electro-hydraulically operated Turn Tables, on a maximum draught of 4.26 meters.
High-standard accommodation facilities for a total of 77 persons are provided, offering ideal hotel facilities for lengthy projects in remote areas of the world.
The vessel is fitted with an ABS certified Class II Dynamic Positioning System which controls the vessel’s five (5) 1,000 HP Azimuthing thrusters and one (1) 2,400 HP Voith Schneider Propulsor.
The vessel also features two (2) specially designed “spud cans” for position keeping redundancy while operating in shallow waters and a 4-point mooring system consisting of four 30-Ton pull anchor winches (2 fore and 2 aft) each fitted with 800m of wire rope and a 5t Flipper-Delta anchor.
The Atalanti (Greek: Αταλάντη / Atalántē) is named after the ancient Greek mythological heroine of the same name, said to have been the fastest runner amongst the mortals and the only female crew member of the Argo during Jason’s mythological quest of the golden fleece (the Argonautic Expedition).
Kaskasi II (Germany) – Subsea Cable Laying & Protection
The Kaskasi II project concerns the realization of a three-phase AC connection in North-Sea-Cluster 4. The three-phase current generated in the Kaskasi II offshore wind farm is to be transported to the HVDC substation HelWin Beta via two AC subma …
Viking Link is a 1,400MW 760km subsea interconnector between the substation Bicker Fen in Lincolnshire, UK and the substation Revsing in southern Jutland, Denmark. The purpose of the project is the transmission of electrical energy between Revsing Den …
Cyclades Phase D The Naxos Thira Interconnection comprises the design, supply and installation of a single circuit 150kV AC Submarine and Optical Cables System for the electrical interconnection of Thira (Santorini) island to the Hellenic Electricity T …
The Lavrio – Karystos project concerns the interconnection of Karystia Wind Farms located at the southern part of Evia Island (Karystia region) to the Mainland Power Transmission System at PPC Lavrion substation. he interconnection will be configured b …
Cyclades Phase B The Cyclades Phase B project consists of two interconnections, one between Paros and Naxos and one between Naxos and Mykonos. The Paros-Naxos interconnection has a maximum sea depth of approximately 60 m and the length of the indicativ …
The project Mantoudi-Skiathos Interconnection concerns the design, supply and installation of a single circuit 150kV AC Submarine and Underground Transmission Line for the interconnection of Skiathos Island to the Evia Island (Mantoudi), adjacent to Gr …
Kahramaa (Qatar general Electricity & Water Corporation) had appointed Prysmian Cavi è Sistemi Energia SrL for a power transimission system expansion project, which was to develop the country’s first ever submarine power link serving Qatar. Th …
The Kafireas project concerns the interconnection of 16 Wind Farms located at the southern part of Evia Island (southeast of Karystos) to the Hellenic mainland Power Grid at Pallini EHV Center (Attica region). The interconnection will be configured by …
The “Albatros” project concerns the HVAC grid connection to the offshore wind farm Albatros. The connection uses the existing “north” Global Tech 1 cable route (Borwin beta – GlobalTech 1) already installed. After the initial pull-in at Albatros OWF pl …
Deutsche Bucht – Submarine Link Cables Installation and Protection
The DBU project concerns the HVAC submarine link between the AC/DC offshore converter station BorWin beta platform and the Deutsche Bucht offshore wind park, located in the South-West German Bight region of the southern North Sea. The system is compose …
Global Tech 1 – Submarine Link Cables Installation and Protection
The Global Tech 1 (GT-1) project concerns the realization of a new HVAC grid connection between the offshore substation BorWin Gamma and the grid connection point (OSS) on the OWF Global Tech 1 by jointing the existing cables and new cables. The system …
The Rampion Offshore Wind Farm (ROWF) is located in the English Channel, approximately 13km offshore the Sussex coast. The wind farm consists of 116 wind turbines, installed at water depths between 19m and 40m. The maximum total output is 400MW and the …
The COBRA cable project consists of the power link between Denmark and The Netherlands and it has been developed by Energinet.dk and TenneT TSO B.V. The purpose of COBRA Cable is to allow for the integration of more renewable energy into the Dutch and …
BorWin3 project refers to a 900MW DC grid connection system in the North Sea cluster 8 developed by TenneT. The system’s direct current is transmitted from BorWin gamma offshore converter platform to a TenneT substation located in Emden/Ost, through a …
The COBRA cable project consists of the power link between Denmark and The Netherlands and it has been developed by Energinet.dk and TenneT TSO B.V. The cables system that was installed is composed by: 2 High Voltage Direct Current (HVDC) 1 Fiber …
The COBRA cable project consists of the power link between Denmark and The Netherlands and it has been developed by Energinet.dk and TenneT TSO B.V. The purpose of COBRA Cable is to allow for the integration of more renewable energy into the Dutch and …
BorWin3 project refers to a 900MW DC grid connection system in the North Sea cluster 8 developed by TenneT. The system’s direct current is transmitted from BorWin gamma offshore converter platform to a TenneT substation located in Emden/Ost, through a …
The COBRA cable project consists of the power link between Denmark and The Netherlands and it has been developed by Energinet.dk and TenneT TSO B.V. The cables system that was installed is composed by: 2 High Voltage Direct Current (HVDC) 1 Fiber …
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.