Pirelli Cavi e Sistemi Energia S.p.A. was awarded a Contract by Basslink PTY Ltd. for the supply installation and protection of a 400KV DC submarine cable system between Victoria and Tasmania.

Pirelli Cavi e Sistemi Energia S.p.A. as a main contractor for the above project apppointed Assodivers for the execution of the protection of the  underwater cable bundle for a total length of 39.5 Km. 

Assodivers used the Assotrencher IV trenching vehicle equipped with a mechanical cutter in the shape of a wheel, to create a trench of suitable dimensions for the protection of the cables in hard seabed soil structure with a depth of i approx. 0.5m. And a trench width shall be approx. 0.3 m.

Cable burial through the hard seabed sections  provided cable protection with minimum disturbance to seabed soil.

PROJECT SPECIFICATIONS

  • Contractor
    Pirelli Cavi e Sistemi Energia SpA./ Asso.subsea Ltd.
  • Year
    2004
  • Cable Diameter
    121mm / 260mm
  • Trenching Length & Burial Depth
    54.635 km / DOB 0.5m
  • Max Water Depth
    80m
    No projects found

SERVICES PROVIDED

Some of the services we provided for Basslink Project 

No items found

VESSELS USED

No items found

EQUIPMENT USED

No items found

Let's discuss your project!

We are here to provide more information & answer any questions you might have.
envelopemap-markersmartphonedownloadcrossmenuchevron-downchevron-leftchevron-rightarrow-right
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram