Seabed Preparation

Share this:

Seabed is filled with rocks, boulders, debris, and other irregularities. Our interventions are necessary when installing submarine cables, to ensure that a “clean” and “stable” base is prepared. Combining different operations such as PLGR (Pre Lay Grapnel), Route Clearance, Boulder Clearance, and Pre-trenching, we are able to clean and level the surface and so to create the right path for the cables to be installed.