Atalanti
DP II - Cable Laying Vessel The Atalanti is a DP-2 Cable Laying Vessel that has been specially ...
The Kaskasi II project concerns the realization of a three-phase AC connection in North-Sea-Cluster 4. The three-phase current generated in the Kaskasi II offshore wind farm is to be transported to the HVDC substation HelWin Beta via two AC submarine cables.
The system is composed by two power cables with an interstitial optical unit that was simultaneously laid and buried independently from each other on two parallel routes of approx. 4 km length each.
ZTT has awarded Asso a contract for the execution of work includes 10.280km (2 cables, 5km each) submarine cable installation and protection including the initial pull-ins on platform.
Asso’s scope of work included:
The Kaskasi II project concerns the realization of a three-phase AC connection in North-Sea-Cluster 4. The three-phase current generated in the Kaskasi II offshore wind farm is to be transported to the HVDC substation HelWin Beta via two AC subma ...
Some of the services we provided for Kaskasi II (Germany) - Subsea Cable Laying & Protection
DP II - Cable Laying Vessel The Atalanti is a DP-2 Cable Laying Vessel that has been specially ...
DP II - Trenching Support Vessel The Aethra is a DP-2 Trenching Support Vessel built for worldwide operations, ...
DP I - Anchor Handling and Supply Vessel The Artemis is a DP-1 Anchor Handling Tug & Supply ...