DP III – Cable Laying Vessel The Ariadne is a DP-3 Cable Laying Vessel built for worldwide subsea …

Prysmian has been awarded a contract by Terna SpA for the construction of an HVAC interconnection system, designated as the “Messina II” project. The project connects the Italian mainland with Sicily. This vital infrastructure facilitates the transmission of electricity between the converter stations located in Calabria, on the Italian peninsula, and the island of Sicily.
The submarine cable portion of the system consists of six HVAC power cables (poles) operating at 380kV, organized in two circuits of three cables each. In addition, two optical cables run in conjunction with two of the power cables, one in each circuit. These power cables are a critical link for the efficient transfer of energy, with a length of approximately 38km each.
Prysmian contracted ASSO to install mattresses along a designated section of the route to ensure stability and protection of the cables.
Vessel/equipment used:
By integrating cutting-edge technology and expertise, this project has not only strengthened the regional energy infrastructure, but also underscored the commitment to sustainable energy transmission throughout the entire area.