Albatros HVAC Connection

Share this:

The “Albatros” project concerns the HVAC grid connection to the offshore wind farm Albatros. The connection uses the existing “north” Global Tech 1 cable route (Borwin beta – GlobalTech 1) already installed. After the initial pull-in at Albatros OWF platform, the new HVAC cable will be laid towards the BorWin beta – Global Tech 1 HVAC North cable, which will then be cut on seabed and connected to Albatros HV cable at the jointing area. Finally, the final joint will be deployed on the seabed.

Prysmian has awarded ASSO a contract for the execution of the submarine cables installation, included trans pooling of cable, PLGR along the Albatros route corridor and cable lay from the platform to the jointing location.

ASSO’s scope of work included:

  • Preparation activities // Mobilization activities 
  • PLGR
  • Platform pull-in
  • Jointing operations (vessel serves as working platform)

PROJECT SPECIFICATIONS

  • Owner
    TenneT TSO GmbH
  • Contractor
    Prysmian PowerLink SrL
  • Year
    2019
  • Location
    Germany
  • Cable Type
    hvac
  • Cable Diameter
    221 mm
  • Laying Length
    2,000 m
  • Max Water Depth
    40m

SERVICES PROVIDED

Some of the services we provided for Albatros HVAC Connection 

No items found

VESSELS USED

  • Atalanti

    DP II – Cable Laying Vessel The Atalanti is a DP-2 Cable Laying Vessel that has been specially …

    Atalanti Cable Laying Vessels
  • Artemis

    DP I – Anchor Handling and Supply Vessel The Artemis is a DP-1 Anchor Handling Tug & Supply …

    Artemis General Support Vessels

EQUIPMENT USED

No items found

Let's discuss your project!

We are here to provide more information & answer any questions you might have.
envelopemap-markersmartphonedownloadmagnifiercrossmenuchevron-downchevron-leftchevron-rightarrow-right
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram