The Evia-Andros-Tinos project concerns the islands of Evia, Andros, and Tinos are linked together by four outdated single-core oil-filled AC Submarine Power Cables. Has been planned by IPTO the replacement of the existing power transfer system between the aforementioned islands. The Evia-Andros-Tinos Project consists of the supply and installation of a Power and Optical Cable System for the two Crossings.
The submarine cable is a tripolar armored cable that includes an interstitial fiber optic unit. The land cables system is typified by three (3) single-core power cables and a separate fiber optic cable. Submarine and land cables are connected by sea/land joints that are installed at beach landings.
At Evia and Tinos landings, two sea-land joints bay are constructed in order to install joints to connect the submarine cable with the land cables. At these landings, land cables are installed from the sea/land joint position to cable terminations inside the electrical stations.
Prysmian has awarded ASSO a contract for the execution of the onshore site preparation, submarine cables protection, and mattresses installation.
ASSO’s scope of work included:
Some of the services we provided for Evia – Andros – Tinos
DP III - Cable Laying Vessel The Ariadne is a DP-3 Cable Laying Vessel built for worldwide operations, ...
DP II - Multipurpose Support Vessel The Astrea is a DP-2 Multipurpose Support Vessel built for worldwide operations ...
Multipurpose Support Vessel The Alcyone is a Multi-Purpose Support Vessel specially built for shallow water operations, in light ...