The Lavrio-Syros II project concerns the second interconnection, between Syros and the Greek Mainland (Lavrio, Attica). This project is the third phase of the Interconnection of the Cyclades to the Greek Mainland Grid.
In summary, the submarine cable route has a length of approx. 108km and a maximum sea depth of approximately 300 meters. The underground part of the 150kV AC Transmission Line on Lavrio side is approximately 1050m long, while the underground part of the 150kV AC Transmission Line on Syros side is approximately 600m long.
Nexans has awarded Asso a contract for the execution of pre-lay mattresses installation, the submarine cable protection up to 100m w.d. and additionally the landfall preparation and assistance.
Asso’s scope of work included:
Some of the services we provided for Lavrio – Syros Interconnection (Greece) – Nearshore Protection Work & Mattresses
DP III – Cable Laying Vessel The Ariadne is a DP-3 Cable Laying Vessel built for worldwide operations, …
DP II – Trenching Support Vessel The Aethra is a DP-2 Trenching Support Vessel built for worldwide operations, …
DP II – Multipurpose Support Vessel The Astrea is a DP-2 Multipurpose Support Vessel built for worldwide operations …
Multipurpose Support Vessel The Alcyone is a Multi-Purpose Support Vessel specially built for shallow water operations, in light …