Atalanti
DP II – Cable Laying Vessel The Atalanti is a DP-2 Cable Laying Vessel that has been specially …
Cyclades Phase B
The Cyclades Phase B project consists of two interconnections, one between Paros and Naxos and one between Naxos and Mykonos.
The Paros-Naxos interconnection has a maximum sea depth of approximately 60 m and the length of the indicative route is 7.1 km for the submarine section plus approximately 3,050m for the underground section on Paros shore and 100m for the underground section on Naxos shore.
The Naxos-Mykonos interconnection has a maximum sea depth of approximately 110 mand the length of the indicative route is 44.7 km for the submarine section plus 100m for the underground section on Naxos shore and 420m for the underground section on Mykonos shore.
IPTO requested an AC Power and an Optical Cables System consisting of:
Fulgor S.A. has awarded Asso a contract for the execution of cable laying, landing and protection of the submarine cable.
Asso’s scope of work included:
Cyclades Phase B The Cyclades Phase B project consists of two interconnections, one between Paros and Naxos and one between Naxos and Mykonos. The Paros-Naxos interconnection has a maximum sea depth of approximately 60 m and the length of the indicativ …
Some of the services we provided for Paros – Naxos – Mykonos Interconnection (Greece) -Subsea Cable Laying & Protection
DP II – Cable Laying Vessel The Atalanti is a DP-2 Cable Laying Vessel that has been specially …
DP II – Multipurpose Support Vessel The Astrea is a DP-2 Multipurpose Support Vessel built for worldwide operations …
Multipurpose Support Vessel The Alcyone is a Multi-Purpose Support Vessel specially built for shallow water operations, in light …