Specializing in submarine cable installation, protection, repair, and support operations, Asso.subsea has established a constantly updated long track record of participation, not only in domestic but also in worldwide projects.

Filter by:
Learn more about Kaskasi II (Germany) - Subsea Cable Laying

Kaskasi II (Germany) - Subsea Cable Laying

The Kaskasi II project concerns the realization of  a three-phase AC connection in North-Sea-Cluster 4. The three-phase current ...

2022 Kaskasi II Germany 7
Learn more about Albatros HVAC Connection

Albatros HVAC Connection

The “Albatros” project concerns the HVAC grid connection to the offshore wind farm Albatros. The connection uses the ...

Albatros HVAC Connection Photo 5
Learn more about Deutsche Bucht - Submarine Link Cables Installation and Protection

Deutsche Bucht - Submarine Link Cables Installation and Protection

The DBU project concerns the HVAC submarine link between the AC/DC offshore converter station BorWin beta platform and ...

Deutsche Bucht Submarine Link Cables Installation and Protection Photo 2
Learn more about Global Tech 1 - Submarine Link Cables Installation and Protection

Global Tech 1 - Submarine Link Cables Installation and Protection

The Global Tech 1 (GT-1) project concerns the realization of a new HVAC grid connection between the offshore ...

Global Tech 1 Submarine Link Cables Installation and Protection Photo 1
Learn more about Rampion OWF - Export Cable 4

Rampion OWF - Export Cable 4

The Rampion Offshore Wind Farm (ROWF) is located in the English Channel, approximately 13km offshore the Sussex coast. ...

Rampion OWF Export Cable 4 Photo 9
Learn more about Kriegers Flak CGS

Kriegers Flak CGS

Energinet SOV and 50Hertz Transmission GmbH have built a cable connection, consisting of two HVAC cables, between Krieger’s ...

Kriegers Flak CGS Photo 2
Learn more about BorWin 3 - Pull-in on Platform

BorWin 3 - Pull-in on Platform

BorWin3 project refers to a 900MW DC grid connection system in the North Sea cluster 8 developed by ...

BorWin 3 Pull in on Platform Photo 1

Let's discuss your project!

We are here to provide more information & answer any questions you might have.
envelopemap-markersmartphonedownloadcrossmenuchevron-downarrow-right
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram